Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Kabupaten |
: |
Kota Surabaya |
Kode Pos |
: |
60162 |
Telepon |
: |
(031) 3530514 / 3555798 |
Fax |
: |
(031) 3531686 |
|
|
: |
[email protected] |
Website |
: |
https://ptbbi.co.id/ |
NPWP |
: |
01.000.029.7-051.000 |
Bentuk Badan Usaha |
: |
PT |
Jenis Badan Usaha |
: |
Pelaksanaan |
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
| No | Sub Bidang Klasifikasi/Layanan | Nomor Kode | Kualifikasi | Kemampuan Dasar | Asosiasi | Tgl Permohonan | Tgl Cetak Pertama | Tgl Cetak Perubahan Terakhir | Tgl Reg Th2 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Tahun | Nilai (Rp. Juta) |
|||||||||
| 1 | Jasa Pelaksana Konstruksi Instalasi Pembangkit Tenaga Listrik Semua Daya | EL001 | M2 | 2011 | 13381 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | 2020-03-30 |
| 2 | Jasa Pelaksana Instalasi Pembangkit Tenaga Listrik daya maksimum 10 MW | EL002 | M2 | 2012 | 20331 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | 2020-03-30 |
| 3 | Jasa Pelaksana Instalasi Pembangkit Tenaga Listrik Energi Baru dan Terbarukan | EL003 | B1 | 2019 | 51406 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | 2020-03-30 |
| 4 | Jasa Pelaksana Instalasi Jaringan Transmisi Tenaga Listrik Tegangan Tinggi/Ekstra Tegangan Tinggi | EL004 | M2 | 2011 | 22752 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | 2020-03-30 |
| 5 | Jasa Pelaksana instalasi Sistem Kontrol dan Instrumentasi | EL009 | B1 | 2015 | 103863 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | 2020-03-30 |
| 6 | Jasa Pelaksana Instalasi Tenaga Listrik Gedung dan Pabrik | EL010 | B1 | 2015 | 54319 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | 2020-03-30 |
| 7 | Jasa Pelaksana Konstruksi Pertambangan dan Manufaktur | MK006 | B1 | 2011 | 71959 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 8 | Jasa Pelaksana instalasi thermal, bertekanan, minyak, gas, geothermal (pekerjaan rekayasa) | MK007 | B1 | 2012 | 110002 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 9 | Jasa pelaksana instalasi alat angkut dan alat angkat | MK008 | M1 | 0 | GAKLIMDO | 2020-07-09 | 2020-09-07 | 2020-09-07 | ||
| 10 | Jasa Pelaksana Konstruksi Instalasi Perpipaan, Gas, Energi (Pekerjaan Rekayasa) | MK009 | B1 | 2014 | 65591 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 11 | Jasa pelaksana instalasi fasilitas produksi, penyimpanan minyak dan gas (pekerjaan rekayasa) | MK010 | B1 | 2015 | 60653 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 12 | Jasa Pelaksana Untuk Konstruksi Saluran Air, Pelabuhan, Dam, dan Prasarana Sumber Daya Air Lainnya | SI001 | M2 | 2012 | 22255 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 13 | Jasa Pelaksana Konstruksi Instalasi Pengolahan Air Minum dan Air Limbah Serta Bangunan Pengolahan Sampah. | SI002 | M2 | 2012 | 29324 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 14 | Jasa Pelaksana Untuk Konstruksi Perpipaan Minyak dan Gas Jarak Jauh | SI007 | B1 | 2019 | 142294 | AKI | 2020-02-20 | 2020-05-04 | 2020-05-04 | |
| 15 | Jasa Terintegrasi Untuk Konstruksi Manufaktur | TI503 | B2 | 2017 | 316229 | GAPENRI | 2018-06-08 | 2018-07-12 | 2019-10-22 | |
Subklasifikasi yang tidak terbit karena belum registrasi tahun ke-2 atau ke-3 |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
|
|
||
|---|---|---|
| No Akte |
|
76 |
| Nama Notaris |
|
Bebasa, S.H. |
| Alamat |
|
JL.Teluk Betung No. 8 Jakarta |
| Kota / Kabupaten |
|
Kota Jakarta Pusat |
| Propinsi |
|
DKI Jakarta |
| Tanggal Akte |
|
30-August-1971 |
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|
|
|
|
|
3 | Imas Fatimah S.H. | Jl. H. Agus Salim 86 | Kota Jakarta Pusat | DKI Jakarta |
|
|
06 | LENNY JANIS ISHAK, SH | Jl. Hang Lekir IX No. 1 | Kota Jakarta Selatan | DKI Jakarta |
|
|
07 | LENNY JANIS ISHAK, SH | Jl. Hang Lekir IX No. 1 | Kota Jakarta Selatan | DKI Jakarta |
|
|
05 | Nurul Larasati, SH | Jl. Raya Pasar Minggu Km. 17 No. 21 | Kota Jakarta Selatan | DKI Jakarta |
|
|
49 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
23 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
65 | Hj. Eva Fitri Sagitarina, SH | Jl . Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
01 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
62 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
06 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
46 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
|
|
07 | Hj. Eva Fitri Sagitarina, SH | Jl. Wonosari Kidul No. 11 | Kota Surabaya | Jawa Timur |
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|
|
|
Moch. Agus Budiyanto | 17-August-1963 | Taman Pinang Indah D2/28 RT. 016/007, Ds. Banjarbendo, Kec. Sidoarjo | 3515081708630007 | Direktur | Tidak ada |
|
|
Ir. Arman Hakim Nasution, M.Eng | 13-August-1966 | Baratajaya 11/3 RT. 03/05, Kel. Baratajaya,, Kec. Gubeng | 3578081308660006 | Komisaris Utama | Tidak ada |
|
|
Drs. Yoyok Hadi Satriyono, MM | 02-September-1963 | Prima Lingkar Asri B-3 No. 8 RT. 05/08, Kel. Jatibening, Kec. Pondok Gede | 3275080209630019 | Direktur Utama | S2 |
|
|
Ir. Jumain Appe, M.Si | 25-October-1959 | Jl. Intan Ujung /8 RT. 02/02, Kel. Cilandak Barat, Kec. Cilandak | 3174062510590005 | Komisaris | Tidak ada |
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
|
Pemilik Saham
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|
|
|
Kementerian Keuangan Republik Indonesia | 00000 | Gedung Djuanda I Lantai 12, Jalan Dr. Wahidin Raya No. 1 | 295114 |
1000 |
0.00 |
0.00 |
|
|
Kementerian Keuangan Republik Indonesia | 0000 | Gedung Djuanda I Lantai 12, Jalan Dr. Wahidin Raya No. 1 | 340916 |
1000 |
340916000.00 |
0.00 |
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
|
No
|
Proyek
|
Pemberi Tugas
|
Sub Bidang Kualifikasi
|
Nomor
|
Tanggal
|
|||||||
|
Tahun
|
Nama
|
Nilai Rupiah
(dalam ribuan) |
Kontrak
|
NKPK
|
Berita Acara Serah Terima
|
Berita Acara Serah Terima
|
Kontrak
|
Mulai
|
Selesai
|
|||
|
|
2006 | Pekerjaan Desain Pengadaan & Konstruksi Jarul Belt Conveyor ke PLTU Tarahan unit 4 Tanjung Enim Sumatera Selatan | 11574358 | PT TAMBANG BARUBARA BUKIT ASAM | MK008 | 1 | 014/P.39506&P.39507;/K/PTBA-BBI/2006 | BA No. 014.BA/05-044/CHF/II/2008 | 23 July 2008 | 23 June 2006 | 23 June 2006 | 23 July 2008 |
|
|
2006 | Fas. Produksi PLTP Unit 2 & 3 ( 2 x 20 MW) | 30000000 | EL003 | 1 | 1410/C0000/2006-SO | 138/PGE000/2008-SO | 31 July 2009 | 28 January 2009 | 28 January 2009 | 31 July 2009 | |
|
|
2011 | Fabrication Equipment Cooler & Kiln Hood - Tonasa Ujung Pandang, Tonasa Paket V | 8000000 | MK006 | 1 | 2098/SP/HK.02.04/65.00/07-2010 | 111/BAST-1/05-2011 | 28 April 2011 | 19 July 2010 | 19 July 2010 | 28 April 2011 | |
|
|
2011 | Pekerjaan Fabrikasi Equipment Cooler Casing & Kiln Hood Tonasa V (Paket P2217) | 8800000 | PT Semen Tonasa | MK006 | 1 | 2098/SP/HK/.02.04/65.00/07-2010 | 111/BAST/-1/05-2011 | 28 April 2011 | 22 July 2010 | 22 July 2010 | 28 April 2011 |
|
|
2011 | Perkerjaan Fabrikasi Local Part Electrostatic Precipitator, Conditioning Tower & Preduster Tonasa V Paket P2205 | 20680000 | PT Semen Tonasa | MK006 | 1 | 2105/SP/HK.02.04/65.00/07-2010 | 494/2221/10.2011 | 03 October 2011 | 19 July 2010 | 19 July 2010 | 03 October 2011 |
|
|
2012 | Pekerjaan Fabrikasi Hopper Plate & Apron Feeder, Chain Scraper, Discharge Conveyor Psas Tonasa V (Paket P2201) | 9020000 | PT Semen Tonasa | MK006 | 1 | 2106/SP/HK.02.04/65.00/07-2010 | 021/4100/02/2012 | 01 February 2012 | 19 July 2010 | 19 July 2010 | 01 February 2012 |
|
|
2011 | Pembangunan Pabrik Pengolahan Kelapa Sawit Kapasitas 45 Ton/Jam di Desa Kerang Dayo, Kecamatan Batu Engau, Kabupaten Paser | 5989495 | PT. SARASWANTI SAWIT MAKMUR | EL002 | 1 | 274/SSM-DIR/XII/2011 | - | 28 April 2014 | 05 December 2011 | 05 December 2011 | 05 December 2012 |
|
|
2014 | North Bangkok - Supply of Condenser Supoort Plates Drilled & Manufacturing of FWT Deaeretor and Condenser | 20622742 | Alstom Ltd | MK009 | 1 | 4500631098 | QA01/COC/005/2014 Unit-21 | 15 April 2014 | 16 May 2013 | 16 May 2013 | 15 April 2014 |
|
|
2012 | PEMBANGUNAN TANKI2O.000 Bbl, 10.000 Bbl, DAN 2000 Bbl 01 UBEP SANGASANGA &TARAKAN; - PAKET III TANKI KAPASITAS 2.000 Bbl | 3744250 | PT Pertamina EP UNEB | MK007 | 1 | 4650001989 | - | 17 October 2012 | 13 July 2011 | 13 July 2011 | 17 October 2012 |
|
|
2010 | Pekerjaan Jasa Fabrikasi Shell Kiln Tonasa V (Paket P2214-1) | 8250000 | PT Semen Tonasa | MK006 | 1 | 728/SP/HK.02.04/65.00/03-2010 | 465/2221/12.2010 | 31 December 2010 | 22 March 2010 | 22 March 2010 | 31 December 2010 |
|
|
2010 | Fabrication Shell Kiln - Tonasa Ujung Pandang, Tonasa Paket V (Paket P2214-1) | 7500000 | MK006 | 1 | 728/SP/HK.02.04/65.00/07-2010 | 465/2221/12.2010 | 31 December 2010 | 22 March 2010 | 22 March 2010 | 31 December 2010 | |
|
|
2015 | Matindok Gas Development Project (MGDP)-Engineering, Procurement and Construction- Supply of Columns | 19015425 | PT Technip Indonesia | MK010 | 1 | 7518051031160008 | - | 06 November 2015 | 27 August 2014 | 27 August 2014 | 06 November 2015 |
|
|
2016 | Matindok Gas Development Project -Stiper Reboiler (Shell and Tube Heat Exchanger) | 4388175 | PT Technip Indonesia | MK010 | 1 | 7518061031230039 | - | 28 March 2016 | 04 November 2014 | 04 November 2014 | 28 March 2016 |
|
|
2016 | Matindok Gas Development Project (MGDP)-Gas Heat Exchanger (Shell and Tube Heat Exchanger) | 3569049 | PT Technip Indonesia | MK010 | 1 | 7518061031270041 | - | 28 March 2016 | 24 November 2014 | 24 November 2014 | 28 March 2016 |
|
|
2014 | Pekerjaan Fabrikasi Pipa Non Carbon Steel Senoroh Gas Development Project | 9497189 | PT Tripatra | MK009 | 1 | 9608-PI-LOA-081 | 048/1552.006/06.2014 | 30 May 2014 | 04 September 2013 | 04 September 2013 | 30 May 2014 |
|
|
2017 | Project PLN Muara Karang Combined Cycle Power Plant (400 - 500 MW) | 16950000 | Mitsubishi Corporation | EL003 | 1 | A1F-P-MK-6F-17-303R0 | A1F-P-TOC-6F-18-451R0 | 07 February 2019 | 30 August 2017 | 15 July 2018 | 07 February 2019 |
|
|
2015 | Development of Donggi Gas Production Facilities Project | 20130000 | PT Rekayasa Industri | MK007 | 1 | DNGF-PC200-POS-1130 | - | 07 July 2015 | 21 July 2014 | 21 July 2014 | 07 July 2015 |
|
|
2014 | Jasa Engineering, Procurement & Construction (EPC) Upgrading Conveyor Terminal Cigading 1 | 32562450 | PT. KRAKATAU BANDAR SAMUDERA | EL009 | 1 | HK.02.01/34.03/DU/XII/2014 | KP.08.03/40.04/Tim-UpCon/IX/2015 | 10 September 2015 | 12 December 2014 | 12 December 2014 | 10 September 2015 |
|
|
2011 | Pekerjaan Pembuatan 4 (Empat) Unit Storage Tank Kapasitas masing-masing 5000 Ton di Pelabuhan Dumai | 3845428 | PT. EKA DURA INDONESIA | EL001 | 1 | LOA No. 05.11.114/Ext/Fin.Proc | - | 15 July 2012 | 30 May 2011 | 06 June 2011 | 06 December 2011 |
|
|
2012 | Pelaksanaan Pekerjaan Pembuatan 4 Unit storage Tank Kapasitas 5000 Ton di Pelabuhan Dumai PT Eka dura Indonesia | 28560571 | PT Ekadura Indonesia | MK007 | 1 | LOA No. 05.11Exl/Fin.Proc | - | 15 July 2012 | 30 May 2011 | 30 May 2011 | 15 July 2012 |
|
|
2017 | Mechanical and Civil Works for Pal Oil Factory Sungai Tawang 50/100 TPH | 105409700 | PT. Kapuasindo Palm Industry | TI503 | 1 | M2ST/JKTO/03/15/003-m&c; | 031/BAST/STWM/Mech/VIII/2017 | 08 August 2017 | 13 March 2015 | 13 March 2015 | 08 August 2017 |
|
|
2019 | Pekerjaan Pembangunan Workshop Machining Centre | 46918558 | PT Barata Indonesia (Persero) | SI007 | 1 | NO BI : 003/SPK/PMN/XII/2017 , NO BBI: 050/SP.BBI.1000/12.2017 | 001/BAST-1/BBI-BRT/8.2019 | 30 August 2019 | 12 December 2017 | 12 December 2017 | 30 August 2019 |
|
|
2013 | Pembangunan Pabrik Minyak Kelapa Sawit Kapasitas 30 Ton TBS/Jam | 17029780 | PT. BIMA AGRI SAWIT | EL010 | 1 | PERJ/BAS-001/VIII/2013 | - | 01 June 2015 | 20 August 2013 | 20 August 2013 | 01 June 2015 |
|
|
2010 | Pembangunan Pabrik Minyak Kelapa Sawit Kapasitas 30 Ton. TBS/Jam Peningkatan ke 60 Ton. TBS/Jam | 6538495 | PT. BIMA PALMA NUGRAHA | EL004 | 1 | PERJ/BPN-001/V/2010 | 001/BA/ENG/BPN/V/2013 | 28 May 2013 | 25 May 2010 | 25 May 2010 | 20 November 2011 |
|
|
2012 | Pembangunan Pabrik Minyak Kelapa Sawit Kapasitas 30 Ton. TBS/J Peningkatan ke 60 Ton TBS/J | 6556088 | PT Bima Palma Nugraha | SI001 | 1 | Perj/BPN-001/V/2010 | - | 19 April 2012 | 25 May 2010 | 25 May 2010 | 19 April 2012 |
|
|
2012 | Pembangunan Pabrik Minyak Kelapa Sawit Kapasitas 30 Ton. TBS/J Peningkatan ke 60 Ton TBS/J | 8638724 | PT Bima Palma Nugraha | SI002 | 1 | Perj/BPN-001/V/2010 | - | 19 April 2012 | 25 May 2010 | 25 May 2010 | 19 April 2012 |
|
|
2014 | Pembangunan Bulking Malloy Kapasitas 2000 Ton x 2 | 5857094 | PT Bima Palma Nugraha | SI007 | 1 | PERJ/BPN-002/XI/2012 | - | 28 March 2014 | 14 November 2012 | 14 November 2012 | 28 March 2014 |
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-2 |
|---|---|---|---|---|---|---|---|
| 1 | TI503 | B2 | GAPENRI | ||||
| 2 | MK006 | B1 | AKI | ||||
| 3 | MK007 | B1 | AKI | ||||
| 4 | MK009 | B1 | AKI | ||||
| 5 | MK010 | B1 | AKI | ||||
| 6 | SI001 | M2 | AKI | ||||
| 7 | SI002 | M2 | AKI | ||||
| 8 | SI007 | B1 | AKI | ||||
| 9 | EL001 | M2 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 10 | EL002 | M2 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 11 | EL003 | B1 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 12 | EL004 | M2 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 13 | EL009 | B1 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 14 | EL010 | B1 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 15 | MK008 | M1 | GAKLIMDO |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|
Nama Badan Usaha |
: |
BOMA BISMA INDRA (PERSERO) |
Alamat Badan Usaha |
: |
JL. KHM Mansyur No. 229 Kel. Nyamplungan, Kec. Pabean Cantikan |
Telepon |
: |
(031) 3530514 / 3555798 |
NPWP |
: |
01.000.029.7-051.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-3 |
|---|---|---|---|---|---|---|---|
| 1 | TI503 | B2 | GAPENRI | ||||
| 2 | MK006 | B1 | AKI | ||||
| 3 | MK007 | B1 | AKI | ||||
| 4 | MK009 | B1 | AKI | ||||
| 5 | MK010 | B1 | AKI | ||||
| 6 | SI001 | M2 | AKI | ||||
| 7 | SI002 | M2 | AKI | ||||
| 8 | SI007 | B1 | AKI | ||||
| 9 | EL001 | M2 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 10 | EL002 | M2 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 11 | EL003 | B1 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 12 | EL004 | M2 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 13 | EL009 | B1 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 14 | EL010 | B1 | GAKLIMDO | 2020-03-30 | 2020-03-30 | ||
| 15 | MK008 | M1 | GAKLIMDO |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|