Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Kabupaten |
: |
Kota Jakarta Selatan |
Kode Pos |
: |
12820 |
Telepon |
: |
021-8354170 |
Fax |
: |
021-8354149 |
|
|
: |
[email protected] |
Website |
: |
www.toyo-eng.com |
NPWP |
: |
01.067.434.9-053.000 |
Bentuk Badan Usaha |
: |
|
Jenis Badan Usaha |
: |
Pelaksanaan |
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
| No | Sub Bidang Klasifikasi/Layanan | Nomor Kode | Kualifikasi | Kemampuan Dasar | Asosiasi | Tgl Permohonan | Tgl Cetak Pertama | Tgl Cetak Perubahan Terakhir | Tgl Reg Th2 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Tahun | Nilai (Rp. Juta) |
|||||||||
| 1 | Jasa Pelaksana Konstruksi Instalasi Pembangkit Tenaga Listrik Semua Daya | EL001 | B2 | 2016 | 1414800 | GAPEKSINDO | 2018-04-02 | 2018-04-24 | 2019-07-09 | 2019-10-24 |
| 2 | Jasa Pelaksana Untuk Konstruksi Jalan Raya (kecuali jalan layang), jalan, rel kereta api, dan landas pacu bandara | SI003 | B2 | 2019 | 1028393 | GAPEKSINDO | 2019-10-22 | 2019-10-31 | 2019-10-31 | |
| 3 | Jasa Terintegrasi Untuk Konstruksi Fasilitas Minyak dan Gas | TI504 | B2 | 2015 | 5206568 | GAPENRI | 2018-07-25 | 2018-09-05 | 2019-07-09 | 2020-04-13 |
Subklasifikasi yang tidak terbit karena belum registrasi tahun ke-2 atau ke-3 |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
|
|
||
|---|---|---|
| No Akte |
|
0100-01-024113 |
| Nama Notaris |
|
|
| Alamat |
|
Jepang |
| Kota / Kabupaten |
|
Luar Negeri |
| Propinsi |
|
Luar Negeri |
| Tanggal Akte |
|
01-November-1944 |
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|
|
|
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|
|
|
Fumitaka Shintsu | 14-May-1979 | Fairmont Residence Jl. Asia Afrika No.8 Tanah Abang | TR8413731 | Tidak ada | |
|
|
Haruo Nagamatsu | 01-April-1957 | TR3629295 | Tidak ada |
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
|
Pemilik Saham
|
|
|
|
|
|
|
|
|
|---|
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
|
No
|
Proyek
|
Pemberi Tugas
|
Sub Bidang Kualifikasi
|
Nomor
|
Tanggal
|
|||||||
|
Tahun
|
Nama
|
Nilai Rupiah
(dalam ribuan) |
Kontrak
|
NKPK
|
Berita Acara Serah Terima
|
Berita Acara Serah Terima
|
Kontrak
|
Mulai
|
Selesai
|
|||
|
|
2014 | Pasifico Energy Kumenan Godo Kaisha 32.256MW(DC) | 471600000 | EL001 | 1 | - | - | 07 March 2016 | 22 May 2014 | 22 May 2014 | 07 March 2016 | |
|
|
2015 | Ethylene Plant Cap. Expansion from 600KTA to 820KTA | 1730661240 | PT. Chandra Asri Petrochemical | TI504 | 3 | CAP ECCx | Mechanical Completion 9 Dec 2015 | 09 December 2015 | 13 September 2013 | 13 September 2013 | 09 December 2015 |
|
|
2015 | CP-107- Railway Systems dan Trackwork | 342797598 | PT. Mass Rapid Transit | SI003 | 1 | CP 107 No. CON/006/MRT/IV/2015 | MRT/107/003 | 27 March 2019 | 15 June 2015 | 15 June 2015 | 27 March 2019 |
|
|
2015 | Pekerjaan Pemasangan Instalasi Elektromagnetik dan Instalasi Pembangkit Tenaga Listrik pada Gedung dan Pabrik Lokasi Desa Sumpul-Driyorejo | 84620597 | PT. Teknindo Solusi Prima | EL001 | 1 | KONT-0024.01/TSP-II/DIR-VIII/2015-THI | KONT-0024.01/TSP-II/DIR-VIII/2015-THI | 11 March 2016 | 11 August 2015 | 24 April 2019 | 11 March 2016 |
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-2 |
|---|---|---|---|---|---|---|---|
| 1 | EL001 | B2 | GAPEKSINDO | 2019-10-22 | 2019-10-22 | 2019-10-24 | 2019-10-24 |
| 2 | TI504 | B2 | GAPENRI | 2020-04-09 | 2020-04-09 | 2020-04-13 | 2020-04-13 |
| 3 | SI003 | B2 | GAPEKSINDO |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|
Nama Badan Usaha |
: |
TOYO ENGINEERING CORPORATION |
Alamat Badan Usaha |
: |
Wisma IKPT Lt. 2 Jl. M.T Haryono Kav.4-5 |
Telepon |
: |
021-8354170 |
NPWP |
: |
01.067.434.9-053.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-3 |
|---|---|---|---|---|---|---|---|
| 1 | EL001 | B2 | GAPEKSINDO | ||||
| 2 | TI504 | B2 | GAPENRI | ||||
| 3 | SI003 | B2 | GAPEKSINDO |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|