Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Kabupaten |
: |
Kota Jakarta Timur |
Kode Pos |
: |
13340 |
Telepon |
: |
021-8193708 |
Fax |
: |
021-8196107 |
|
|
: |
[email protected] |
Website |
: |
http://www.hutamakarya.com |
NPWP |
: |
01.001.611.1-093.000 |
Bentuk Badan Usaha |
: |
PT |
Jenis Badan Usaha |
: |
Pelaksanaan |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
| No | Sub Bidang Klasifikasi/Layanan | Nomor Kode | Kualifikasi | Kemampuan Dasar | Asosiasi | Tgl Permohonan | Tgl Cetak Pertama | Tgl Cetak Perubahan Terakhir | Tgl Reg Th2 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Tahun | Nilai (Rp. Juta) |
|||||||||
Subklasifikasi yang tidak terbit karena belum registrasi tahun ke-2 atau ke-3 |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
|
|
||
|---|---|---|
| No Akte |
|
74 |
| Nama Notaris |
|
Kartini Muljadi S.H. |
| Alamat |
|
Jl. Gajah Mada 218 - 219 |
| Kota / Kabupaten |
|
Kota Jakarta Pusat |
| Propinsi |
|
DKI Jakarta |
| Tanggal Akte |
|
15-March-1973 |
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|
|
|
|
|
Imas Fatimah S.H. | Jl. Setiabudi Selatan Kav. 16-17 | Kota Jakarta Selatan | DKI Jakarta | |
|
|
Imas Fatimah S.H. | Jl. Setiabudi Selatan Kav. 16-17 | Kota Jakarta Selatan | DKI Jakarta | |
|
|
Imas Fatimah S.H. | Jl. Setiabudi Selatan Kav. 16-17 | Kota Jakarta Selatan | DKI Jakarta | |
|
|
P. Suandi Halim, SH. | Jl. Dewi Sartika No. 357 C | Kota Jakarta Timur | DKI Jakarta | |
|
|
Sri Ismiyati, SH. | Jl. Raya Boulevard Blok RA I No. 24, Kelapa Gading Permai | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH. | Jl. Raya Boulevard Blok RA I No. 24 Kelapa Gading Permai | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH. | Jl. Raya Boulevard Blok RA I No. 24 Kelapa Gading Permai | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH. | Jl. Raya Boulevard Blok RA I No. 24 Kelapa Gading Permai | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH. MKn. | Rukan Artha Gading Niaga, Blok B, No. 7-8 Jln. Boulevard Artha Gading, Kelapa Gading Barat | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH | Rukan Artha Gading Niaga, Blok B, No.7-8 Jl. Boulevard Artha Gading, Kelapa Gading Barat | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH | Rukan Artha Gading Niaga, Blok B, No.7-8 Jl. Boulevard Artha Gading, Kelapa Gading Barat | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH | Rukan Artha Gading Niaga, Blok B, No.7-8 Jl. Boulevard Artha Gading, Kelapa Gading Barat | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH | Rukan Artha Gading Niaga, Blok B, No.7-8 Jl. Boulevard Artha Gading, Kelapa Gading Barat | Kota Jakarta Utara | DKI Jakarta | |
|
|
Sri Ismiyati, SH. MKn. | Rukan Artha Gading Niaga, Blok B, No. 7-8, Jln. Boulevard Artha Gading, Kelapa Gading Barat | Kota Jakarta Utara | DKI Jakarta | |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|
|
|
Bintang Perbowo | 15-February-1954 | Jl. Gebang Sari Dalam No. 34 RT.001 RW.005 Kel. Bambu Apus Kec. Cipayung | 3175101502540006 | Direktur Utama | S2 |
|
|
Anis Anjayani, SE. | 21-October-1961 | Jl. Jati Padang Raya No. 1 RT.001/RW.004 Jati Padang, Pasar Minggu | 3374136110610001 | Direktur | S1 |
|
|
Ir. Bambang Pramusinto | 11-September-1959 | Jl. Ayub Noor Residence II/49 Kav.8 RT.009/RW.001 Pejaten Barat, Pasar Minggu | 3174041109590003 | Direktur | S1 |
|
|
Ir. Sugeng Rochadi | 21-February-1966 | Jl. Bendungan Sengguruh No. 22 RT/RW 003/007, Sumbersari Lowokwaru, Malang | 3573052102660005 | Direktur | S1 |
|
|
Ir. Putut Ariwibowo, MM. | 11-April-1965 | Citra Gran Blok G9/02 TR/RW 004/011, Jatikarya, Jatisampurna, Bekasi | 3275101104650003 | Direktur | S2 |
|
|
Ir. Suroto | 24-August-1964 | Komp Daichi Antapani Kav. 10 Rt.008 Rw.007, Cicaheum Kiaracondong | 3273162408640001 | Direktur | Tidak ada |
|
|
Dr. ST. Burhanuddin, SH. MM. Mh | 17-July-1959 | Jl. Pitanala No. 18 KBP Rt. 001 Desa Cipeundeuy, Kec Padalarang | 3217081707590006 | Tidak ada | |
|
|
Ir. Achmad Gani Ghazali Akman, MEng. Sc | 21-June-1961 | Komp. Bina Marga Blok BB 8/1 Rt 005 Rw 001 Kel Pondok Kelapa, Duren Sawit | 3175072106610007 | Tidak ada | |
|
|
Adityawarman | 25-October-1955 | Jl. Bumi Harapan Permai Blok M4 Rt 008 Rw 006 Kel Dukuh, Kec. Kramat Jati | 3175042510550004 | Tidak ada | |
|
|
Mukhamad Taufiq, SE | 14-May-1970 | Komplek Bolog BLK C/23 Kayu Putih, Pulo Gadung | 3175021405700008 | Tidak ada | |
|
|
Drs. Musyafak, SH, MM | 12-July-1959 | Jl. Depkes II No 56, RT 04 RW 07, Jatibening, Pondok Gede Bekasi, Jawa Barat | 3275081207590035 | Komisaris | S2 |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
|
|
|||
|---|---|---|---|
| Tahun | 2013 | Pembayaran Wajib Pajak | 411667 |
| Tahun | 2012 | Pembayaran Wajib Pajak | 0 |
|
Omset 5 tahun Terakhir
|
|||||
| Tahun | 2012 | Nilai Omset pada Tahun Bersangkutan (Rp) | 5032628044 | ||
| Tahun | 2012 | Nilai Omset pada Tahun Bersangkutan (Rp) | 2012 | ||
| Tahun | 2011 | Nilai Omset pada Tahun Bersangkutan (Rp) | 3602152801 | ||
| Tahun | 2010 | Nilai Omset pada Tahun Bersangkutan (Rp) | 2574608739 | ||
| Tahun | 2009 | Nilai Omset pada Tahun Bersangkutan (Rp) | 3049550687 | ||
|
Pemilik Saham
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|
|
|
Pemerintah Republik Indonesia cq. Dep. Keuangan RI | 0 | Jl. Lapangan Banteng Timur No. 2-4 | 4100000 |
1000 |
0.00 |
0.00 |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
|
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|---|
|
|
BUSMART ZURIANTOMY | 14 March 1969 | JL. UTAMA SARI GG SARI I RT:001 RW:007 KEL. TANGKERANG SELATAN KEC. BUKIT RAYA, KOTA PEKANBARU,PROVINSI RIAU | 1471071403690001 | 1002206 | AHLI | ||
|
|
IR. BAMBANG MUSTAQIM, MM | 07 February 1969 | JL. ARWANA BLOK C NO.26 RT. 016 KEL. TIMBAU KEC. TENGGARONG | 6402060702690002 | 1002209 | AHLI | ||
|
|
HUDAELI KUSNENDAR | 16 September 1969 | MATRAMAN RT 015/006 MANGGARAI TEBET JAKARTA SELATAN | 0953011611690162 | 1004445 | AHLI | ||
|
|
Ir. FACHRIZAL NAIKEM, MM | 16 February 1968 | JLN KH AHMAD DAHLAN 1 NO 4 RT/RW 001/006 KUKUSAN DEPOK JABAR | 3276061602680004 | 1005469 | AHLI | ||
|
|
FREDY KUNCORO .ST | 07 May 1977 | JL. AGIL KUSUMADYA NO. 27 BLORA | 1704010705770007 | 1005874 | AHLI | ||
|
|
Ir. SANTOSA | 09 January 1962 | PURI HUTAMA JL TULIP BLOK M NO 12 RT 10 RW 13 JATIMULYA TAMBUN SELATAN KAB BEKASI | 3216080911620001 | 1006764 | AHLI | ||
|
|
SAEBANI, ST | 28 September 1967 | KP. RUKEM RT 003 RW 013 MANGUNJAYA TAMBUN SELATAN | 3216062809670001 | 1016105 | AHLI | ||
|
|
JUSUF SITORUS | 06 January 1970 | JL. SEGARA WANA NO 43 HARAPAN JAYA BEKASI UTARA KOTA BEKASI | 3275030603700026 | 1016179 | AHLI | ||
|
|
ROHMAT DANANG NUR RIYADI, ST | 22 August 0979 | KAV CELEPUK III BLOK A NO 5 RT 4 RW 12 JATIMAKMUR PONDOKGEDE KOTA BEKASI | 3275082208790032 | 1016236 | AHLI | ||
|
|
HARIYANTO,ST | 05 July 1981 | TLOGO KOPEN RT.RW 001/008 KEL.BATURSARI KEC.MRANGGEN | 3320040507810002 | S1 | 1016356 | AHLI | |
|
|
DONY RAHARJO JATI | 12 January 1976 | PALAWIJA NO. 64 RT 01 RW 09 KEL. BEJI KEC. BEJI | 3276061201760003 | S1 | 1023016 | AHLI | |
|
|
WIDYA CHANDRA WIGUNA, ST | 27 May 1982 | PERUM GRISIMAI DD13 RT/RW.017/006 KEL.MANGUNSUMAN KEC.SIMAN | 3502102705820004 | S1 | 1070470 | AHLI | |
|
|
IR. FREDY KUNCORO | 07 May 1977 | JL. HALMAHERA NO.03 RT/RW 06/03 KRANGGAN PRAJIT KULON | 3316090705770002 | S1 | 1089208 | AHLI | |
|
|
OKTAVIANUS SITANGGANG, ST.MT | 08 October 1982 | Taman Bintaro Blok Q No.3 Sektor I RT001/009 Kel. Rengas kec. ciputat timur | 3674050810820004 | S1 | 1099781 | AHLI | |
|
|
AHMAD A. SIBALI | 09 January 1974 | AROEPALA KOMP. PHL BLK P.12/11, RT. 007/014, KASSI-KASSI, RAPPOCINI | 7371130901740002 | S2 | 1100250 | AHLI | |
|
|
BROMO WALUKO UTOMO | 28 December 1982 | LUBANG BUAYA, RT. 003/007, LUBANG BUAYA, CIPAYUNG | 3175102812820001 | S1 | 1103450 | AHLI | |
|
|
IR. PANCA HADI SUPRAYITNO | 26 May 1965 | JL. DELIMA IV GG 4 NO. 48 RT. 008 RW. 005 KEL. MALAKA SARI, KEC. DUREN SAWIT, KOTA JAKARTA TIMUR PROVINSI DKI JAKARTA | 3175072605650008 | S1 | 1104901 | AHLI | |
|
|
D. SUPRAPTO | 07 April 1971 | JL BUAH BATU REGENCY BLOK E-1 NO 15 RT/RW 005/009 KUJANSARI BANDUNG KIDUL BANDUNG JABAR | 3273210704710003 | 1167901 | AHLI |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
|
No
|
Proyek
|
Pemberi Tugas
|
Sub Bidang Kualifikasi
|
Nomor
|
Tanggal
|
|||||||
|
Tahun
|
Nama
|
Nilai Rupiah
(dalam ribuan) |
Kontrak
|
NKPK
|
Berita Acara Serah Terima
|
Berita Acara Serah Terima
|
Kontrak
|
Mulai
|
Selesai
|
|||
|
|
2008 | Pekerjaan Pengadaan dan Pemasangan Pipa Saluran Sistem Pengolahan Limbah dan Bak Penampung | 87652121 | PT. BIMA PALMA NUGRAHA | SI006 | 1 | 0015/DIV-A/SPP-BPN/HK/DIR-X/2008 | BASTP.01-0024/DIV-A/BPN-HK/DIR-VIII/2009 | 25 August 2009 | 23 October 2008 | 23 October 2008 | 25 August 2009 |
|
|
2013 | Pembangunan Pabrik Cement Mill II Maros Pkt Vertikal Mill Bosowa | 114646340 | PT. Semen Bosowa Maros | BG003 | 1 | 004/PMO/K/SBM-HK/IV/2012 | BA-PHO-1/001/VCM-II/X/2013 | 31 October 2013 | 02 April 2012 | 02 April 2012 | 31 October 2013 |
|
|
2012 | Proyek EPC Pembangunan Jaringan Gas Bumi untuk Rumah Tangga di Sidoarjo | 28956141 | 'Dirjen MiGas, Kementrian ESDM | MK009 | 1 | 01.KK/BANG-SDJL/PPK-PJDGB/2001 | 01.2.ST-K/P2K-Jargas/2012 | 02 January 2012 | 01 July 2011 | 01 July 2011 | 02 January 2012 |
|
|
2014 | Pembangunan Pembangkit Listrik Tenaga Minihidro (PLTMH) Parmonangan 2X4.5 MW Desa Manalu Dolok, Kec. Parmonangan | 137500000 | PT Seluma Clean Energy | EL003 | 1 | 011/XII/SCE/2014 | 29 Desember 2016 | 29 December 2016 | 29 December 2014 | 29 December 2014 | 29 December 2016 |
|
|
2011 | Upgrading Instalasi Pengolahan Limbah Cair (IPAL) dan Kualitas Limbah Cair di PT. Pertamina (Persero) RU II Dumai | 46117500 | PT. Pertamina (Persero) | SI009 | 3 | 02/E10000/2011-S2 | 763/E12200/2013-SS | 30 August 2013 | 20 January 2011 | 20 January 2011 | 30 August 2013 |
|
|
2010 | Pemb. Hotel & Apartement Grand Royal Panghegar di Bandung Jawa Barat | 310000000 | PT. Panghegar Kana Properti | BG006 | 1 | 021/PKP-CM HK/XI/2008 | 01/CCM-GRP/HKVII/2010 | 05 July 2010 | 01 December 2008 | 01 December 2008 | 05 July 2010 |
|
|
2011 | Pekerjaan Peningkatan/Pembangunan Instalasi Fasilitas Produksi dan Pompa Minyak/Gas kapasitas 17.000 DWT dan Dermaga Backloading kapasitas 3.500 DWT | 17139281 | PT. Jambo Permata Lestari | MK010 | 1 | 0228.11-SPK/JPL-HK/DIR-X/2011 | 0236.11-BASTP.01/JPL-HK/DIR-IV/2012 | 18 April 2012 | 20 September 2011 | 20 September 2011 | 18 April 2012 |
|
|
2011 | Pembangunan Instalasi Perpipaan Fasilitas Pengumpul Gas Merbau dan fasilitas penyerahan gas pagardewa | 87114200 | PT. PERTAMINA EP | MK009 | 1 | 0251.41/M00124/EP/DIR-IV/2011-SO | BASTP.01-0251.48/M00124/EP/DIR-XII/2011-SO | 15 December 2011 | 15 April 2011 | 15 April 2011 | 15 December 2011 |
|
|
2005 | Pembangunan The 18Th Residence Taman Rasuna | 1448008 | PT. Bakrie Swasakti Utama | EL008 | 1 | 06 Akta Notaris | BAST ; tgl. 30 November 2007 | 30 November 2007 | 13 September 2005 | 13 September 2005 | 30 November 2007 |
|
|
2007 | Pembangunan The 18TH Residence Taman Rasuna | 4791029 | PT. Bakrie Swasakti Utama. | MK001 | 1 | 06 Akta Notaris Ny. Mita Nursita Gunawan, SH | BAST I Tgl 30 November 2007 | 30 November 2007 | 13 September 2005 | 13 September 2005 | 30 November 2007 |
|
|
2007 | Pembangunan The 18TH Residence Taman Rasuna | 8884235 | PT. Bakrie Swasakti Utama. | MK005 | 1 | 06 Akta Notaris Ny. Mita Nursita Gunawan, SH | BAST I Tgl 30 November 2007 | 30 November 2007 | 13 September 2005 | 13 September 2005 | 30 November 2007 |
|
|
2006 | Semi Rancang dan Bangunan Proyek Bakrie Tower | 2138651 | PT. Bakrie Swasakti Utama | EL008 | 1 | 08 Akta Notaris | BA ; tgl. 01 April 2010 | 01 April 2010 | 16 November 2006 | 16 November 2006 | 01 April 2010 |
|
|
2010 | Pembangunan Gedung Bakrie Tower Jakarta | 507457299 | PT. Bakri Swasakti Utama | BG005 | 1 | 08 Akta Notaris Muchlis Pataha Sh, MKn | 01/04/2010 | 01 April 2010 | 16 November 2006 | 16 November 2006 | 01 April 2010 |
|
|
2011 | Pekerjaan Peningkatan Kualitas Penerangan Jalan dan Tempat Umum dan Pemasangan Jaringan Listrik serta Penyambungan Daya Listrik 1300 VA | 83455100 | PT. Adhi ciptagriya MandirI | EL007 | 1 | 082.04/SPP-ACGM/IV/2011-HK | 088.04/BASTP.01-ACGM/HK-IX/2011 | 12 September 2011 | 11 April 2011 | 11 April 2011 | 12 September 2011 |
|
|
2012 | Proyek Pembangunan Jaringan Penyediaan Air Bersih, Instalasi Pengolahan Air, Rehabilitasi Pintu Intake serta Retikulasi Pipa Sambung Diameter 1,5 | 16758000 | PT. Nugraha Jaya Abadi | SI002 | 1 | 092/PERJ-NJA/DIV-A/HK-X/2012 | 098/BASTP.01-NJA/DIV-A/HK-IV/2013 | 22 April 2013 | 22 October 2012 | 22 October 2012 | 22 April 2013 |
|
|
2012 | Pembangunan Sarana Penyediaan Air Baku Kota Prabumulih (150 Ltr/Det) | 28027958 | Kementerian PU. BBWS Sumatera VIII | SI008 | 1 | 13/SP/PJPA.SS/BBWSS.VII/PAB/2012 | 10/BAST/PHO/PAB/BBWSS.VIII/2012 | 31 December 2012 | 28 September 2012 | 28 September 2012 | 31 December 2012 |
|
|
2013 | Proyek EPC Pengembangan Pelabuhan PT. Petrokimia Gresik | 95779254 | PT PETROKIMIA GRESIK | MK008 | 1 | 1575/TU.04.04/28/SP/2011 | HK/PYK-EPC/2013/IV-395 | 23 April 2013 | 07 November 2011 | 07 November 2011 | 23 April 2013 |
|
|
2008 | Pembangunan Jalan Tol JORR W1 Paket 6&7 Kebon Jeruk - Penjaringan, Jakarta | 355000000 | PT. Jakarta Lingkar Baratsatu | SI004 | 1 | 23/JLB/SPP-IV/2008 | 65/JLB/BAST-P6&7/II/2010 | 22 February 2010 | 28 April 2008 | 28 April 2008 | 22 February 2010 |
|
|
2014 | Pekerjaan Pemasangan Instalasi Panel Kontrol dan Instrumentasi untuk Sistem Pengendali Listrik | 88586225 | PT GUDANG PRIMA INDONESIA | EL009 | 1 | 2514/PERJ-GPI/DIV.I/2014 | 2518/BASTP.01-GPI/DIV.I/DIR-VII/2014 | 21 July 2014 | 20 January 2014 | 20 January 2014 | 21 July 2014 |
|
|
2012 | Pembangunan Gedung Apartemen Sentra Timur Residence | 237498726 | Konsorsium PERUMNAS & PT BAKRIE PANGRIPTA LOKA | BG002 | 1 | 4/13 November 2008 | 10/09/2012 | 10 September 2012 | 13 November 2008 | 13 November 2008 | 10 September 2012 |
|
|
2010 | Pekerjaan Pembangunan Lapangan Golf, Lapngan Basket, Hall Senam pada Pusat Rekreasi Taman Selorejo Ngantang | 86392400 | PT. Anugerah Alam Raya | SI012 | 1 | 425.01/Pemb.TWSN/SPP-AAR/VIII/2010 | BAST.01-428.01/Pemb.TWSN/AAR/III/2011 | 17 March 2011 | 19 August 2010 | 19 August 2010 | 17 March 2011 |
|
|
2017 | Pembangunan Jalan Layang Kapt. - Tendean - Blok M - Cileduk, Paket Taman Puring | 99968545 | Dinas Bina Marga Prov. DKI Jakarta | PL003 | 1 | 45384/-1.792 | 498/-1.792 | 31 January 2017 | 15 December 2014 | 15 December 2014 | 31 January 2017 |
|
|
2013 | Pekerjaan Jasa Konstruksi Pembangunan Gedung (EKS GED DITJEN KEUDA) Kementrian Dalam Negeri Tahun Anggaran 2013 | 369445 | Kementerian Dalam Negeri Republik Indonesia | EL008 | 1 | 602/2001/BU/VI/2013 | 602/5302/XII/2013 | 01 December 2013 | 07 June 2013 | 07 June 2013 | 31 December 2013 |
|
|
2013 | Pembangunan Gedung (Eks Gedung Keuda) Kementerian Dalam Negeri Tahun Anggaran 2013 | 1163432 | Kementerian Dalam Negeri RI | MK001 | 1 | 602/2001/BU/VI/2013 | 602/5302/XII/2013 | 31 December 2013 | 07 June 2013 | 07 June 2013 | 31 December 2013 |
|
|
2013 | Pekerjaan Pembangunan Gedung (Eks Ged Ditjen Keuda) Kementerian Dalam Negeri (Pekerjaan Plumbing) | 1615514 | Kementerian Dalam Negeri RI | MK002 | 1 | 602/2001/BU/VI/2013 | 602/5302/XII/2013 | 31 December 2013 | 07 June 2013 | 07 June 2013 | 31 December 2013 |
|
|
2013 | Pembangunan Gedung (Eks Gedung Keuda) Kementerian Dalam Negeri Tahun Anggaran 2013 | 3832680 | Kementerian Dalam Negeri | MK005 | 1 | 602/2001/BU/VI/2013 | 602/5302/XII/2013 | 31 December 2013 | 07 June 2013 | 07 June 2013 | 31 December 2013 |
|
|
2013 | Pembangunan Rumah Sakit Jiwa Bangli Propinsi Bali | 94563634 | Pemprov Bali-RS. Jiwa Bangli | BG008 | 1 | 640/2974/RS.JIWA | 640/3299/RS.JIWA | 26 November 2013 | 23 October 2012 | 23 October 2012 | 26 November 2013 |
|
|
2014 | Pembangunan Sport Centre Dharmasraya Sumatra Barat | 90000000 | Pemerintah Kabupaten Dhamasraya Dinas PU | SI011 | 1 | 641/01/SCK/KPA-DPU/III | 641/01.3-BA/SC/KPA-DPU/IV-2014 | 20 April 2014 | 01 March 2012 | 01 March 2012 | 20 April 2014 |
|
|
2010 | Proyek Lifestyle Entertaiment Centre | 216395469 | PT. Bakri Swasakti Utama | BG004 | 1 | Akta No.03 Notaris Mita Nursita Gunawan, SH | 01/04/2010 | 01 April 2010 | 16 November 2006 | 25 September 2006 | 01 April 2010 |
|
|
2008 | Proyek Apartemen Sentra Timur Residence (Pekerjaan Plumbing) | 22161408 | Perum Perumnas & PT. Bakrie Pangripta Loka | MK002 | 1 | Akte No.04 thn 2008 | 10-09-2012 | 10 September 2012 | 13 November 2008 | 13 November 2008 | 10 September 2012 |
|
|
2005 | Pembangunan The 18th Residence Taman Rasuna (Pekerjaan Plumbing) | 7383831 | PT. Bakrie Swasakti Utama | MK002 | 1 | Akte No.06 | 30-11-2007 | 30 November 2007 | 13 September 2005 | 13 September 2005 | 30 November 2007 |
|
|
2006 | Semi Rancang dan Bangun Proyek Bakrie Tower (Pekerjaan Plumbing) | 7849977 | PT. Bakrie Swasakti | MK002 | 1 | Akte No.8 | 01-04-2010 | 01 April 2010 | 16 November 2006 | 16 November 2006 | 01 April 2010 |
|
|
2015 | Fly OverWork Package - Banyu Urip Project Infrastructure Facilities - EPC-5 | 110820887 | Mobil Cepu Ltd | TI501 | 3 | C-3208020 | BA Date 13 Nov 2015 | 13 November 2015 | 06 December 2011 | 06 December 2011 | 13 November 2015 |
|
|
2015 | Basin Work Package - Banyu Urip Project Infrastructure Facilities -EPC-5 | 384038895 | Mobil Cepu Ltd | TI502 | 3 | C-3208020 | BA Date 25 Nov 2015 | 25 November 2015 | 06 December 2011 | 06 December 2011 | 25 November 2015 |
|
|
2015 | Building Work Package - Banyu Urip Project Infrastructure Facilities -EPC5 | 421326353 | Mobil Cepu Ltd | TI505 | 3 | C-3208020 | BA Date 30 Sep 2015 | 30 September 2015 | 06 December 2011 | 06 December 2011 | 30 September 2015 |
|
|
2013 | Civil Works For Cilacap Expansion 1x660MW CFSPP Project | 154674500 | PT. D&C; Engineering | EL001 | 1 | DC-CLPII-2013-011 | DC-CLPII-2013-011 | 31 May 2015 | 11 July 2013 | 11 July 2013 | 31 May 2015 |
|
|
2009 | Pekerjaan Pembangunan Rumah Sakit Medical Center | 1279695 | PARTNERSHIP HK-KAM | EL008 | 1 | DPU/PHH.65/SPK/XII/2009 | BAST I tgl. 25 Maret 2011 | 25 March 2011 | 01 December 2009 | 01 December 2009 | 25 March 2011 |
|
|
2011 | Pekerjaan Pembangunan Rumah SakitT MEDICAL CENTER | 7779359 | PARTNERSHIP HK-KAM | MK001 | 1 | DPU/PHH.65/SPK/XII/2009 | BAST I tgl 25 Maret 2011 | 25 March 2011 | 01 December 2009 | 01 December 2009 | 25 March 2011 |
|
|
2009 | Pekerjaan Pembangunan Rumah Sakit Metropolitan Medical Center (MMC Tower) (Pekerjaan Plumbing) | 12259754 | Partnership HK-KAM | MK002 | 1 | DPU/PHH.65/SPK/XII/2009 | 25-03-2011 | 25 March 2011 | 01 December 2009 | 01 December 2009 | 25 March 2011 |
|
|
2011 | Pekerjaan Pembangunan Rumah SakitT MEDICAL CENTER | 6906692 | PARTNERSHIP HK-KAM | MK005 | 1 | DPU/PHH.65/SPK/XII/2009 | BAST I tgl 25 Maret 2011 | 25 March 2011 | 01 December 2009 | 01 December 2009 | 25 March 2011 |
|
|
2010 | Civil works water treatment, water supply system and asessorial production works, Jeneponto 2x125 MW Coal Fired Stream Power Plant | 52787482 | PT. Bosowa Energie | SI008 | 1 | E09026-CM-06-0001-008 | 21 Maret 2013 | 21 March 2013 | 27 August 2010 | 27 August 2010 | 21 March 2013 |
|
|
2013 | Potensi Rembesan Waduk Jatigede Sumedang | 95956853 | Kementerian PU - Direktorat Jendral Sumber Daya Air | SI001 | 1 | HK.02.03/At-4/16/SAL/01-14/2013 | 01/BA/PAN-PHO-14/16/2013 | 11 December 2013 | 18 March 2013 | 18 March 2013 | 11 December 2013 |
|
|
2012 | Pembangunan Saluran Transmisi Air Baku Lamongan (Lanjutan, Tahap Akhir) | 59213070 | SNVT Balai Besar Wilayah Sungai Bengawan Solo | SI008 | 1 | HK.02.03/BS-09/P.Sal.Transmisi/LMG/2012-05 | 04/BA.STPS/P.Sal.Transmisi/LMG/2012-05 | 28 December 2012 | 13 April 2012 | 16 April 2012 | 31 December 2012 |
|
|
2011 | Pembangunan Sistem Pengembangan Air Baku Telagawaja (Paket VI) di Kabupaten Karangasem | 19419135 | SNVT Pelaksanaan Jaringan Pemanfaatan Air Bali-Penida | SI008 | 1 | HK.02.03/PJPA-BP/PAB/03 | 101/BA/PJPA-BP/PAB/2011 | 09 December 2011 | 14 April 2011 | 14 April 2011 | 14 November 2011 |
|
|
2013 | Proyek Rehabilitasi Prasarana Pengendalian Banjir Sungai Citarum | 80044977 | Kementerian PU - Direktorat Jendral Sumber Daya Air | SI001 | 3 | HK.02.03/PPK-SP.II/SNVT-PJSAC/06 | BAST I 31/12/2013 | 31 December 2013 | 01 November 2011 | 01 November 2011 | 31 December 2013 |
|
|
2015 | Normalisasi Kali Angke Hulu Paket - 2 | 109999345 | Kementerian PU Ditjen SDA Balai Besar Wilayah Sungai Cisadane | PL004 | 3 | HK.02.03/PPL SP-SNVY PJSACC/X/1892 | HK.02.03/PHO/PPK SP.III-SNVT PJSA CC/VII/211.2 | 30 July 2015 | 24 October 2011 | 24 October 2011 | 30 July 2015 |
|
|
2013 | Pembangunan Dermaga Ex Presiden Tanj. Priok dan Lapangan dry Bul Ex Presiden | 116161065 | 'PT. Pelabuhan Indonesia II (Persero) | SI001 | 1 | HK.556/9/20/C.TPK-12 | Um.3391/29/13/C.Tpk-13 | 05 December 2013 | 29 June 2012 | 23 July 2012 | 05 December 2013 |
|
|
2013 | Pembangunan Gardu Induk 150 kV Berikut Jaringan Instalasinya Untuk Kebutuhan Terminal Petikemas Kalibaru Tanjung Priuk | 221908186 | PT. Pelabuhan Indonesia II (Persero) | EL004 | 1 | HK.566/17/19/PI.II-13 | UM.339/25/1/7/PI.II.16 | 25 January 2016 | 21 October 2013 | 21 October 2013 | 25 January 2016 |
|
|
2011 | Pekerjaan Pengembangan Jaringan Listrik Dengan Daya 15 MVA untuk Kebutuhan Operasional Pelabuhan Tanjung Priuk | 101559559 | PT. Pelindo II | EL006 | 1 | HK.566/II/14/C.tpk-11 | 101/BAKF/TML/VII/13 | 02 July 2013 | 05 December 2011 | 05 December 2011 | 02 July 2013 |
|
|
2012 | Pelebaran Jalan Siberida - Batas Jambi di Propinsi Riau | 104559163 | PPK 7 SNVT PJN Wil II | SI003 | 1 | HK0203/PJN.WIL II/PPK7/04 | BA-PHO/PJN.WIL II/PPK7/028 | 21 January 2013 | 18 June 2012 | 18 June 2012 | 29 December 2012 |
|
|
2010 | Pengadaan Rambu Suar Darat serta Lampu Penerangan Jalan Dermaga Pelabuhan Batam International Ferry Terminal beserta Pembangunan Sarana Penunjangnya | 84118200 | PT. Intan Pratama | EL011 | 1 | IP-698.01/PPJP/HK-II/2010-PBIFT | IP-722.01/BASTP.01/HK-X/2010-PBIFT | 11 October 2010 | 12 February 2010 | 12 February 2010 | 11 October 2010 |
|
|
2007 | Pembangunan Sarana dan Prasarana Air Bersih Kota Sigli Kab Pidie (WS-1.07) | 31947274 | Badan Rehabilitasi dan Rekonstruksi NAD-NIAS | SI008 | 1 | K-07/WS-1.07/BRR-889654/PPK-ASDP/APBN-MDF/X/20007 | 906/BA/PHO/BRR.889654/PPK A&s;/APBN/XII/2008 | 30 December 2008 | 11 October 2007 | 11 October 2007 | 30 December 2008 |
|
|
2012 | Pelaksanaan Instalasi dan Perawatan Kabel Dibawah permukaan Tanah Jaringan Telekomunikasi dan Pembangunan menara BTS | 83497325 | PT XL AXIATA TBK | EL008 | 1 | KONTRAK-0082/IAP-SJM/DIRIX/2012 | BAST.I-0088/IAP-SJM/DIR-IV/2013 | 08 April 2013 | 10 September 2012 | 10 September 2012 | 08 April 2013 |
|
|
2012 | Pekerjaan Insulasi Thernal Pipa Air Panas & Dingin, Ketel Uap & Saluran Pembuangan serta Insulasi Anti Kebakaran pd Gunawangsa Merr Apartemen | 16687500 | PT. Indojaya Multi Perkasa | MK004 | 1 | KONTRAK-058.94/IMP-HK/DIR-VIII/2012 | BAST.01-062.94/IMP-HK/DIR-XII/2012 | 10 December 2012 | 10 August 2012 | 10 August 2012 | 10 December 2012 |
|
|
2013 | Pembangunan SPAM (CFNPGA) Lokasi Kawasan Tibulempanas Kab Lombok Tengah | 42755154 | Satker PKPAM NTB | SI008 | 1 | KU.02.09/PKPAM-NTB/VIII/025/2013 | 003/BA-PPTP/PKPAM-NTB/2014 | 22 August 2014 | 12 August 2013 | 15 August 2013 | 22 August 2014 |
|
|
2009 | Pekerjaan Pembangunan Jaringan Air Baku Telaga Gede Pemalang | 28416987 | SNVT Pelaksana Pengelolaan SDA Pemali Juana | SI008 | 1 | KU.03.01/Ao.6.8/Ao.5.2/01 | 08-Tlg/BAP-I/PAB-BBWSPJ/XII/2009 | 23 December 2009 | 23 March 2009 | 23 March 2009 | 24 December 2009 |
|
|
2011 | Pembangunan Jaringan Air Limbah 1 Paket (Paket ABAH 1-2) | 26362349 | Satker PPLP DI Yogyakarta | SI009 | 1 | KU.08.08/CL/PPLP-DIY/323 | KU.08.11/PPLP-DIY/646 | 30 December 2011 | 15 August 2011 | 15 August 2011 | 30 December 2011 |
|
|
2012 | Penanganan Drainase Kota Denpasar Sistem IV (Multi Years) | 149328696 | Kem. PU. Dirjen Cipta Karya | SI009 | 1 | KU.08.08/PIPLPM-HK/12.10 | 1697/BAST/P2LP/2013 | 27 December 2013 | 10 September 2012 | 21 September 2012 | 27 December 2013 |
|
|
2008 | Pembangunan Jaringan Air Limbah DSDP di Denpasar | 15015384 | Dep Pu. Dirjen Cipta Karya Sarbagita Denpasar | SI009 | 1 | KU.08.08/PIPSS-HK/16.08 | UM311/PIPSS/XII/2008 | 05 December 2008 | 30 June 2008 | 30 June 2008 | 05 December 2008 |
|
|
2007 | Pekerjaan Jasa Pemborongan DSDP Paket Kontrak LCB-3 | 10873282 | Dinas PU. Dirjen Cipta Karya Sarbagita Denpasar | SI009 | 1 | KU.08.08/PIPSS-HK/19.07 | UM.173/PIPSS/IX/2008 | 15 September 2008 | 25 October 2007 | 25 October 2007 | 15 September 2008 |
|
|
2013 | Pembangunan Rusunawa Wilayah III Menpera (Rusun 13-22) | 84789851 | Kementerian Perumahan Rakyat RI | BG001 | 1 | KU.08.08/PK-RUSUNWIL3/SATKER-PP/RUSUN13-22/583 | KU.09.04/BA-PHO/PK-RUSUNWIL/SATKER-PP/RUSUN13-22 | 20 December 2013 | 27 September 2013 | 27 September 2013 | 20 December 2013 |
|
|
2015 | Pembangunan Watermark Hotel dan SPA | 21173685 | PT. Harum Indah Sari Indonesia | PL002 | 1 | Mr.IVSy.315/SPP.07/2014 | Mr.IV/ADS.101/BAST I/III/2015 | 31 March 2015 | 22 January 2014 | 22 January 2014 | 31 March 2015 |
|
|
2010 | Semi Rancang dan Bangun Proyek Bakrie Tower | 44273934 | PT. BAKRIE SWASAKTI UTAMA | MK001 | 1 | NO: 08 Akta Notaris Muchlis Pataha Sh, MKn | BAST-I Tgl. 01 April 2010 | 01 April 2010 | 16 November 2006 | 16 November 2006 | 01 April 2010 |
|
|
2010 | Semi Rancang dan Bangun Proyek Bakrie Tower | 41034000 | PT. BAKRIE SWASAKTI UTAMA | MK005 | 1 | NO: 08 Akta Notaris Muchlis Pataha Sh, MKn | BAST-I Tgl. 01 April 2010 | 01 April 2010 | 16 November 2006 | 16 November 2006 | 01 April 2010 |
|
|
2012 | Pembangunan Konstruksi Proyek Apartemen Sentra Timur Residence | 170196 | Perum Perumnas | MK001 | 1 | NOMOR : 04 Tanggal 13 November 2008 | BAST I /10 September 2012 | 10 September 2012 | 13 November 2008 | 13 November 2008 | 10 September 2012 |
|
|
2012 | Pembangunan Konstruksi Proyek Apartemen Sentra Timur Residence | 3710147 | Perum Perumnas | MK005 | 1 | NOMOR : 04 Tanggal 13 November 2008 | BAST I /10 September 2012 | 10 September 2012 | 13 November 2008 | 13 November 2008 | 10 September 2012 |
|
|
2010 | Pembangunan Konstruksi Perpipaan Penyulingan Air Bersih dan Pemasangan Pipa Reservoir | 84662320 | PT. TIRTAMAS JAYA UTAMA | SI005 | 1 | PERJ-002/TJU-HK/11a/DIR-X/2010 | BASTP.01-008/TJU-HK/V/2011 | 18 May 2011 | 20 October 2010 | 20 October 2010 | 18 May 2011 |
|
|
2011 | Pengadaan Dan Pemasangan Ac dalam bangunan Gedung A & B Pada Apartemen The Muria Residances | 83552622 | PT. MULTI BANGUN MANDIRI | MK001 | 1 | PERJ-01.295/MBM-HK/DIR/VII/2011 | 01.322/BASTP.01-MBM/HK/DIR-XII/2011 | 22 December 2011 | 25 July 2011 | 25 July 2011 | 22 December 2011 |
|
|
2009 | Pekerjaan Pengadaan Dan Instalasi Pipa untuk Oksigen berikut Pengoperasional di Rumah Sakit Ibu dan Anak Bunda Asy-Syifa | 17725620 | PT. Sekarguna Medika | MK003 | 1 | PERJ-0365/RS-BAS-HK/DIR-III/2009 | BASTP.01-0371/RS.BAS-HK/DIR-XI/2009 | 05 November 2009 | 10 March 2009 | 10 March 2009 | 05 November 2009 |
|
|
2012 | Pengadaan dan Pemasangan Instalasi Plumbing Hydrant fire Sprinkler da Retikulasi Pipa Air Kotor | 84802000 | PT. SURYA TEKNIK KONSTRUKINDO | MK002 | 1 | PERJ-284.11/DIV-II/STK-HK/DIR-XII/2012 | BASTP.01-392.11/STK-HK/DIR-VI/2013-Pemb | 17 June 2013 | 19 December 2012 | 19 December 2012 | 17 June 2013 |
|
|
2008 | Pembangunan Loading and Discharging stations dan Pekerjaan Penambangan Batubara | 84325100 | PT AGUNG PETRA KENCANA | MK006 | 1 | PERJ-528.01/APK-11a/DIR-VIII/2008 | BASTP.01-535.01/APK-11a/HK-IX/2009 | 11 September 2009 | 11 August 2008 | 11 August 2008 | 11 September 2009 |
|
|
2009 | Pekerjaan Lighting Protection pada Proyek Penyediaan dan Instal System dan Pengadaan CCTV,Penangkal Petir | 84220000 | PT MEBELINDO JAYA | EL010 | 1 | PERJ-898.11/DIV-A/MJ-HK/DIR-X/2009 | BASTP.01-915.11/DIV-A/MJ-HK/DIR-III/2010 | 22 March 2010 | 22 October 2009 | 22 October 2009 | 22 March 2010 |
|
|
2011 | Proyek Pek. Arsitektur & Struktur Atap Gd. Terminal Bandara Medan Baru Kualanamu | 401870445 | PT. Angkasa Pura II (Persero) | BG009 | 1 | PJJ.14.10.3/00/12/2008/349 | BAC.14.10.03/00/05/2011/642 | 02 May 2011 | 15 December 2008 | 15 December 2008 | 02 May 2011 |
|
|
2011 | Pekerjaan Pembagunan Diklat Pelayaran Sorong Tahap III TA. 2011 | 91305044 | Kem. Perhubungan BP. SDM Perhubungan | BG007 | 1 | PL.102/B.1724/IV/PPSDML-2011 | PL.102/B.2839/XII/PPSDML-2011 | 31 December 2011 | 19 August 2011 | 23 August 2011 | 31 December 2011 |
|
|
2016 | Jasa Perancangan, Pengadaan dan Konstruksi Pembangunan Pipa Transmisi Gas Muara Karang-Muara Tawar | 468766609 | PT Pertamina Gas | TI504 | 1 | SP272/PG0330/2014-S0 | BA Date 30 Des 2016 | 30 December 2016 | 28 May 2014 | 28 May 2014 | 30 December 2016 |
|
|
2012 | Pekerjaan Pengadaan dan Pemasangan Lift dan Escalator di Tower A,B dan C serta Tangga Darurat | 83859000 | PT MUTIARA KHARISMA PRIMA | MK005 | 1 | SPK-242/DIV-II/MKP-HK/DIR-VIII/2012 | BASTP.01-249/DIV-II/MKP-HK/DIR-I/2013 | 29 January 2013 | 29 August 2012 | 29 August 2012 | 29 January 2013 |
|
|
2009 | Pengadaan PABX Serta Penambahan/Pengganti Jaringan Telekekomunikasi Transmisi Telekomunikasi Seluler | 84820191 | PT BAHTIAR MSTURA OMAR | EL005 | 1 | TEL028/HK745/D05/HK-III/2009 | BA.1/TEL032/HK746/D05/HK-IX/2009 | 14 September 2009 | 12 March 2009 | 12 March 2009 | 14 September 2009 |
|
|
2016 | Proyek Pembangkit Listrik Tenaga Mini Hidro (PLTM) Cirompang, kap 8 MW, Kab. Garut | 124268516 | PT.Tirta Gemah Ripah | TI503 | 1 | TGR 04/SPP/PLTM-CRP/TGR/VIII/2011 | BA Date 1 April 2016 | 01 April 2016 | 04 August 2011 | 04 August 2011 | 01 April 2016 |
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-2 |
|---|---|---|---|---|---|---|---|
| 1 | PL002 | BI | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 2 | PL003 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 3 | SI003 | B2 | AABI | 2018-12-18 | 2018-12-20 | 2018-12-20 | |
| 4 | SI004 | B2 | AABI | 2018-12-18 | 2018-12-20 | 2018-12-20 | |
| 5 | EL001 | B2 | AKLINDO | 2018-12-18 | 2018-12-18 | 2018-12-18 | |
| 6 | EL003 | B2 | AKLINDO | 2018-12-18 | 2018-12-18 | 2018-12-18 | |
| 7 | EL004 | B2 | AKLINDO | 2018-12-18 | 2018-12-18 | 2018-12-18 | |
| 8 | EL006 | B2 | AKLINDO | 2018-12-18 | 2018-12-18 | 2018-12-18 | |
| 9 | BG001 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 10 | BG002 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 11 | BG003 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 12 | BG004 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 13 | BG005 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 14 | BG006 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 15 | BG007 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 16 | BG008 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 17 | BG009 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 18 | MK008 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 19 | SI001 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 20 | SI011 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 21 | PL004 | B2 | AKI | 2018-12-17 | 2018-12-21 | 2018-12-21 | |
| 22 | SI008 | B2 | AKAINDO | 2018-12-21 | 2018-12-26 | 2018-12-26 | |
| 23 | SI009 | B2 | AKAINDO | 2018-12-21 | 2018-12-26 | 2018-12-26 | |
| 24 | EL005 | B2 | GAPENSI | ||||
| 25 | EL007 | B2 | GAPENSI | ||||
| 26 | EL008 | B2 | GAPENSI | ||||
| 27 | EL009 | B2 | GAPENSI | ||||
| 28 | EL010 | B2 | GAPENSI | ||||
| 29 | EL011 | B2 | GAPENSI | ||||
| 30 | MK001 | B2 | GAPENSI | ||||
| 31 | MK002 | B2 | GAPENSI | ||||
| 32 | MK003 | B1 | GAPENSI | ||||
| 33 | MK004 | B1 | GAPENSI | ||||
| 34 | MK005 | B2 | GAPENSI | ||||
| 35 | MK006 | B2 | GAPENSI | ||||
| 36 | MK009 | B2 | GAPENSI | ||||
| 37 | MK010 | B1 | GAPENSI | ||||
| 38 | SI002 | B1 | GAPENSI | ||||
| 39 | SI005 | B2 | GAPENSI | ||||
| 40 | SI006 | B2 | GAPENSI | ||||
| 41 | SI012 | B2 | GAPENSI | ||||
| 42 | TI501 | B2 | GAPENRI | ||||
| 43 | TI502 | B2 | GAPENRI | ||||
| 44 | TI503 | B2 | GAPENRI | ||||
| 45 | TI504 | B2 | GAPENRI | ||||
| 46 | TI505 | B2 | GAPENRI |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|
Nama Badan Usaha |
: |
HUTAMA KARYA (PERSERO) |
Alamat Badan Usaha |
: |
Jl. Letjen Haryono MT Kav. 8, Cawang |
Telepon |
: |
021-8193708 |
NPWP |
: |
01.001.611.1-093.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-3 |
|---|---|---|---|---|---|---|---|
| 1 | PL002 | BI | AKI | ||||
| 2 | PL003 | B2 | AKI | ||||
| 3 | SI003 | B2 | AABI | ||||
| 4 | SI004 | B2 | AABI | ||||
| 5 | EL001 | B2 | AKLINDO | ||||
| 6 | EL003 | B2 | AKLINDO | ||||
| 7 | EL004 | B2 | AKLINDO | ||||
| 8 | EL006 | B2 | AKLINDO | ||||
| 9 | BG001 | B2 | AKI | ||||
| 10 | BG002 | B2 | AKI | ||||
| 11 | BG003 | B2 | AKI | ||||
| 12 | BG004 | B2 | AKI | ||||
| 13 | BG005 | B2 | AKI | ||||
| 14 | BG006 | B2 | AKI | ||||
| 15 | BG007 | B2 | AKI | ||||
| 16 | BG008 | B2 | AKI | ||||
| 17 | BG009 | B2 | AKI | ||||
| 18 | MK008 | B2 | AKI | ||||
| 19 | SI001 | B2 | AKI | ||||
| 20 | SI011 | B2 | AKI | ||||
| 21 | PL004 | B2 | AKI | ||||
| 22 | SI008 | B2 | AKAINDO | ||||
| 23 | SI009 | B2 | AKAINDO | ||||
| 24 | EL005 | B2 | GAPENSI | ||||
| 25 | EL007 | B2 | GAPENSI | ||||
| 26 | EL008 | B2 | GAPENSI | ||||
| 27 | EL009 | B2 | GAPENSI | ||||
| 28 | EL010 | B2 | GAPENSI | ||||
| 29 | EL011 | B2 | GAPENSI | ||||
| 30 | MK001 | B2 | GAPENSI | ||||
| 31 | MK002 | B2 | GAPENSI | ||||
| 32 | MK003 | B1 | GAPENSI | ||||
| 33 | MK004 | B1 | GAPENSI | ||||
| 34 | MK005 | B2 | GAPENSI | ||||
| 35 | MK006 | B2 | GAPENSI | ||||
| 36 | MK009 | B2 | GAPENSI | ||||
| 37 | MK010 | B1 | GAPENSI | ||||
| 38 | SI002 | B1 | GAPENSI | ||||
| 39 | SI005 | B2 | GAPENSI | ||||
| 40 | SI006 | B2 | GAPENSI | ||||
| 41 | SI012 | B2 | GAPENSI | ||||
| 42 | TI501 | B2 | GAPENRI | ||||
| 43 | TI502 | B2 | GAPENRI | ||||
| 44 | TI503 | B2 | GAPENRI | ||||
| 45 | TI504 | B2 | GAPENRI | ||||
| 46 | TI505 | B2 | GAPENRI |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|