Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Kabupaten |
: |
Kota Jakarta Barat |
Kode Pos |
: |
11410 |
Telepon |
: |
021-5363118 |
Fax |
: |
021-5363116 |
|
|
: |
[email protected] |
Website |
: |
www.kaliraya.co.id |
NPWP |
: |
01.302.639.8-038.000 |
Bentuk Badan Usaha |
: |
PT |
Jenis Badan Usaha |
: |
Pelaksanaan |
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
| No | Sub Bidang Klasifikasi/Layanan | Nomor Kode | Kualifikasi | Kemampuan Dasar | Asosiasi | Tgl Permohonan | Tgl Cetak Pertama | Tgl Cetak Perubahan Terakhir | Tgl Reg Th2 | |
|---|---|---|---|---|---|---|---|---|---|---|
| Tahun | Nilai (Rp. Juta) |
|||||||||
| 1 | Jasa Pelaksana Untuk Konstruksi Bangunan Multi atau Banyak Hunian | BG002 | B1 | 2013 | 57894 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 2 | Jasa Pelaksana Untuk Konstruksi Bangunan Gudang dan Industri | BG003 | M2 | 2013 | 19530 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 3 | Jasa Pelaksana Untuk Konstruksi Bangunan Komersial | BG004 | B1 | 2015 | 178475 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 4 | Jasa Pelaksana Untuk Konstruksi Bangunan Hotel, Restoran, dan Bangunan Serupa Lainnya | BG006 | B1 | 2013 | 133858 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 5 | Jasa Pelaksana Untuk Konstruksi Bangunan Gedung Lainnya | BG009 | M2 | 2013 | 18192 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 6 | Jasa Pelaksana Konstruksi Pemasangan Pipa Gas dalam Bangunan | MK003 | M2 | 2010 | 26861 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 7 | Jasa Pelaksana instalasi thermal, bertekanan, minyak, gas, geothermal (pekerjaan rekayasa) | MK007 | B1 | 2010 | 105577 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 8 | Jasa pelaksana instalasi alat angkut dan alat angkat | MK008 | B1 | 2013 | 60303 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 9 | Jasa Pelaksana Konstruksi Instalasi Perpipaan, Gas, Energi (Pekerjaan Rekayasa) | MK009 | B2 | 2012 | 761907 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 10 | Jasa pelaksana instalasi fasilitas produksi, penyimpanan minyak dan gas (pekerjaan rekayasa) | MK010 | B2 | 2007 | 2118557 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 11 | Jasa Pelaksana Untuk Konstruksi Saluran Air, Pelabuhan, Dam, dan Prasarana Sumber Daya Air Lainnya | SI001 | B1 | 2011 | 137652 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 12 | Jasa Pelaksana Untuk Konstruksi Jalan Raya (kecuali jalan layang), jalan, rel kereta api, dan landas pacu bandara | SI003 | B1 | 2015 | 87151 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 13 | Jasa Pelaksana Konstruksi Pekerjaan Jembatan, Jalan Layang, Terowongan dan Subways | SI004 | B1 | 2013 | 162802 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 14 | Jasa Pelaksana Untuk Konstruksi Perpipaan Minyak dan Gas Jarak Jauh | SI007 | B2 | 2014 | 997508 | AKI | 2017-09-28 | 2017-10-27 | 2019-08-19 | |
| 15 | Jasa Terintegrasi Untuk Konstruksi Fasilitas Minyak dan Gas | TI504 | B2 | 2010 | 2212733 | GAPENRI | 2017-11-20 | 2017-12-12 | 2019-08-19 | 2020-06-02 |
Subklasifikasi yang tidak terbit karena belum registrasi tahun ke-2 atau ke-3 |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
|
|
||
|---|---|---|
| No Akte |
|
1 |
| Nama Notaris |
|
Tjahjadi Hartanto |
| Alamat |
|
Jl. Petojo Sabangan Gg.I No.3 |
| Kota / Kabupaten |
|
Kota Jakarta Pusat |
| Propinsi |
|
DKI Jakarta |
| Tanggal Akte |
|
02-March-1971 |
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||
|---|---|---|---|---|---|
|
|
|
|
|
|
|
|
|
6 | Fifi Wangsadiputra, SH | Jl. Raya Pesanggrahan No. 12C | Kota Jakarta Barat | DKI Jakarta |
|
|
07 | Wisnu Sardjono, S.H. | Jl.pondok Kopi Blok T 3/8 | Kota Jakarta Timur | DKI Jakarta |
|
|
13 | Sulistyaningsih, S.H. | Jl. Permata Meruya II D, Taman Meruya Ilir Blok D.XII No.71 | Kota Jakarta Barat | DKI Jakarta |
|
|
32 | Sulistyaningsih, S.H | Jl. Permata Meruya II D, Taman Meruya Ilir Blok D.XII No. 71 | Kota Jakarta Barat | DKI Jakarta |
|
|
27 | Marliansyah, SH | Gedung DPP-SAS Lt. 2, Jl. Dr. Saharjo No. 115 BX | Kota Jakarta Selatan | DKI Jakarta |
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|
|
|
Ir. Joanes Gunawan | 09-September-1944 | Jl. Taman Surya Blok V No.4, Kedoya Kebon Jeruk | 3173050909440003 | Tidak ada | |
|
|
Gunardi Darmadinata | 04-July-1947 | Jl. Duri Permai IV No.1, Duri Kelapa Kebon Jeruk | 3173050407470001 | Tidak ada | |
|
|
Ir. Vincent Darja | 30-December-1946 | Pantai Mutiara Blok R No.14, Pluit Penjaringan | 3172013012460006 | Tidak ada | |
|
|
Ramli Darmawan | 28-May-1945 | Jl. Pantai Kuta I No.31, Ancol Pademangan | 3172052805450001 | Tidak ada |
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
|
Pemilik Saham
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|
|
|
PT. Tri Anugrah Selaras | - | Puri Imperium Office Plaza, Jl. Kuningan Madya Kav 5-6, Jakarta | 12499 |
1000 |
0.00 |
0.00 |
|
|
Reuben Suryamega | 3171062704790008 | Jl. HOS Cokroaminoto No. 112 Menteng Jakarta Pusat | 1 |
1000 |
0.00 |
0.00 |
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
|||||||
|
|
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
|
No
|
Proyek
|
Pemberi Tugas
|
Sub Bidang Kualifikasi
|
Nomor
|
Tanggal
|
|||||||
|
Tahun
|
Nama
|
Nilai Rupiah
(dalam ribuan) |
Kontrak
|
NKPK
|
Berita Acara Serah Terima
|
Berita Acara Serah Terima
|
Kontrak
|
Mulai
|
Selesai
|
|||
|
|
2014 | Cost Proposal Port Extention (Jetty 3) at Separi New Plant (Civil Works) Tenggarong | 22000000 | PT. Borneo Bara Terminal | SI001 | 1 | 001/BBT/II/2013 | 28/02/2014 | 28 February 2014 | 11 February 2013 | 11 February 2013 | 28 February 2014 |
|
|
2006 | Pembangunan GOR dan Graha Pemuda Kota Balikpapan Phase I | 41088047 | Departemen Pekerjaan Umum | SI011 | 1 | 01/SPP/PK-CK/GOR/X/2004 | 07.C/BAP/PPK-CK/GOR/VIII/2006 | 30 August 2006 | 07 October 2004 | 07 October 2004 | 03 August 2006 |
|
|
2015 | Pekerjaan Struktur dan Arsitektur Proyek AIA Central | 59325000 | PT. Alfaindo Mercu Estate | BG004 | 3 | 011/KKK/ALFINDO/09/13 | - | 07 September 2015 | 26 September 2013 | 26 September 2013 | 07 September 2015 |
|
|
2013 | Paser Coal Project 8th Stageonveyor Erection SMCP | 18975000 | PT. Kideco Jaya Agung | MK008 | 1 | 020/550-550/A/X/2012-2 | 4/10/2013 | 04 October 2013 | 01 November 2012 | 01 November 2012 | 29 September 2013 |
|
|
2013 | Proyek Pembangunan Jalan dan Jembatan Propinsi Kalimantan Timur | 13798838 | Departemen Permukiman dan Prasarana Wil.Direktorat Jenderal Prasarana Wilayah | SI003 | 1 | 05-34/AW-07/RB /A/1798/0704 | KU.09.04-SP/266 A | 20 August 2005 | 07 July 2004 | 07 July 2004 | 20 August 2005 |
|
|
2015 | Pembangunan Turap Jalan Bujangga (Section A) | 28968844 | Dinas Pekerjaan Umum Pemerintah Kabupaten Berau | SI003 | 1 | 07/PPK-PA/TSP.MY/Bujangga/IV/2011 | - | 01 June 2015 | 27 April 2011 | 27 April 2011 | 01 June 2015 |
|
|
2004 | Construction of Badak VLP Gas Compression Phase II Proejct | 2587066 | Vico Indonesia Company | MK003 | 1 | 15820 | FS-173/XI/2004-1219 | 29 November 2004 | 15 March 2004 | 15 March 2004 | 26 October 2004 |
|
|
2012 | Pelebaran Jalan BTS Kota BPP-SP.3 Samboja Km.38 | 11316191 | Direktorat Jenderal Bina Marga | SI003 | 1 | 22-34/PJN.WIL.I-KT/BTS-BPP/BM/APBN/2012 | KU.09.04/PJN-WIL.I-KT/PPK-09/PHO/39/XII/2012 | 10 December 2012 | 16 March 2012 | 16 March 2012 | 10 December 2012 |
|
|
2004 | Pekerjaan Finishing Pembangunan Gedung Pusat Alat Teknik Kenari Mas | 8807339 | PT. Kenari Mas | BG004 | 1 | 23/KM/SPK/XII/02 | BA-SPI/KM/02/2004 | 27 February 2004 | 12 December 2002 | 12 December 2002 | 27 February 2004 |
|
|
2013 | Peningkatan Jalan IV Jl. MT Haryono Balikpapan | 3410835 | Dinas Pekerjaan Umum | SI003 | 1 | 257.16/1.03.01.18.28.5-2-04/B2/XI/2013 | 290.99/1.03.01.18.28.5.2-04/B2/XII/2013 | 23 December 2013 | 14 November 2013 | 14 November 2013 | 23 December 2013 |
|
|
2013 | Renovation of Workshop 44 Tanah Merah Coal Terminal Pasir Mine, East Kalimantan | 6145375 | PT. Kideco Jaya Agung | BG003 | 1 | 263/600-640/B/VII/2012-01 | 14/03/2013 | 23 February 2013 | 23 July 2012 | 23 July 2012 | 23 February 2013 |
|
|
2013 | Pelebaran Jalan Batas Kota Balikpapan-SP Samboja Km.38 Balikpapan | 11947515 | Departemen Pekerjaan Umum Direktorat Jenderal Bina Marga | SI003 | 1 | 28-34/PJN.WIL.I-KT/BTS-BPP.LGS/BM/APBN/2013 | KU.08.01/PJN.WIL.I-KT/PPK-09/PHO/68/VIII/2013 | 30 August 2013 | 04 February 2013 | 04 February 2013 | 30 August 2013 |
|
|
2010 | Construction of VLP Compressors System Facilities at Mutiara Central Plant | 427829 | Vico Indonesia Company | MK003 | 1 | 42080-AFE-58612 | 31/LQ/KRS-HDL/PH/IV-2010 | 30 April 2010 | 10 June 2009 | 11 June 2009 | 30 April 2010 |
|
|
2010 | Construction for Mutiara Gas Lift and Its Supporting Facilities Project | 7800000 | Vico Indonesia Company | MK003 | 1 | 42880 | 35/LX/KRS-HDL/ZN/XII-2010 | 31 March 2010 | 30 September 2009 | 30 September 2009 | 31 March 2010 |
|
|
2010 | Engineering, Procurement, Supply and Construction of Handil oil 20" MOL Replacement | 30657728 | Total E&P; Indonesie | MK007 | 1 | 4500005292 | 15/02/2010 | 15 February 2014 | 20 February 2008 | 20 February 2008 | 31 January 2010 |
|
|
2010 | EPC of New GTS's, MX, Additional Adjacent Wellhead Platforms For GTS And Tie-in to existing Facilities - Tunu Field Development Project - Phase 13A | 642539641 | Total E&P; Indonesie | TI504 | 1 | 4500005928/TP13A/EPSCI | BA Date 2 June 2010 | 02 June 2010 | 14 July 2008 | 14 July 2008 | 02 June 2010 |
|
|
2013 | Cofferdam Installation on RC#5 | 6835732 | Total E&P; Indonesie | SI001 | 1 | 4500008002 | 12N 0006.R | 28 January 2013 | 26 April 2011 | 26 April 2011 | 28 February 2013 |
|
|
2006 | 24 Well Connection For Tambora and Tunu North Area in 2006-2007 | 75869097 | Total E&P; Indonesie | MK009 | 1 | 4600001069 | 6C0281.C | 05 September 2006 | 20 March 2006 | 20 March 2006 | 05 September 2006 |
|
|
2010 | Tunu Phase-12 Well Connections Package#B | 31897941 | Total E&P; Indonesie | SI007 | 1 | 4600001611 | 26/04/2010 | 26 April 2010 | 20 September 2007 | 20 September 2007 | 26 April 2010 |
|
|
2009 | Well Connections At Tatun Area | 150731705 | Total E&P; Indonesia | MK010 | 1 | 4600001899 | 9SO112C | 25 July 2009 | 15 August 2008 | 15 August 2008 | 25 July 2009 |
|
|
2012 | Tatun Well Connection 2009-2012 (Package-B) | 232627108 | Total E & P Indonesia | MK009 | 1 | 4600002236 | 12S090.C | 27 May 2012 | 08 September 2009 | 08 September 2009 | 27 May 2012 |
|
|
2014 | Tatun Well Connection (Mechanical) Package#2 | 325051609 | Total E&P; Indonesia | SI007 | 1 | 4600003175 | 14S238C | 06 May 2014 | 20 April 2012 | 20 April 2012 | 06 May 2014 |
|
|
2011 | Sea Work of TCMT Dolphin No. 5&6 Fuel Unloading Jetty Wharf II | 41000000 | PT. Kideco Jaya Agung | SI001 | 1 | 504/600-640/A/XII/2010/-01 | 29/11/2011 | 29 November 2011 | 24 December 2010 | 24 December 2010 | 29 November 2011 |
|
|
2010 | Pembangunan Jalan MT Haryono (PDAM-SP.4 Balikpapan Baru) | 4589897 | Dinas Pekerjaan Umum | SI003 | 1 | 602/07/PEMB-JLN/MT.HARYONO-APBD/III/2010 | 602/003/PEMB-JLN/MT.HARYONO-APBD/X/2010 | 11 October 2010 | 15 March 2010 | 15 March 2010 | 11 October 2010 |
|
|
2011 | Pemeliharaan Jalan KM.38 Semol Sepaku-Petung | 9871448 | Dinas Pekerjaan Umum | SI003 | 1 | 602/339/KPA/REHAB-PEMEL/VII/2011 | 620/639/KPA/REHAB-PEMEL/XII/2011 | 09 December 2011 | 06 July 2011 | 06 July 2011 | 09 December 2011 |
|
|
2013 | Pembangunan Jembatan Di Jalan Hauling Binungan Mine Operation (BMO) | 51227000 | PT. Berau Coal | SI004 | 1 | BCBM/PD.B.15-003/I-12/RPR | 20/05/2013 | 20 May 2014 | 10 January 2012 | 10 January 2012 | 20 May 2013 |
|
|
2013 | Construction of Head Quarter Office & Restaurant of Integrated Steel Mill at Cilegon | 42119707 | PT. Krakatau Posco | BG006 | 1 | KP 11125 | 002/KRS-KP/FCN/KP11125/11/2013 | 15 October 2013 | 19 January 2012 | 19 January 2012 | 15 October 2013 |
|
|
2013 | Construction of Headquarter Mosque | 5724243 | PT. Krakatau Posco | BG009 | 1 | KP 11249 | 001/KRS-KP/MOSQUE/V/2013 | 20 May 2013 | 21 November 2012 | 21 November 2012 | 20 May 2013 |
|
|
2013 | Annex Building Design Service (Dormitory) of Integrated Steel Mill Dormitory Building | 18216932 | PT. Krakatau Posco | BG002 | 1 | KP11177 | 003/KRS-KP/FCN/KP1117/03/2013 | 04 March 2013 | 28 May 2012 | 01 June 2012 | 04 March 2013 |
|
|
2017 | Rekonstruksi Taxiway Apron Dari Flexible Pavment Menjadi Rigid Pavement Tahap Lanjutan | 8237789 | Angkasa Pura | SI003 | 1 | PBJBPM16001242/PL.02.02/2016-GM.BPN | 53/TK.09.08/GM.BPN/2017 | 29 March 2017 | 09 June 2016 | 09 June 2016 | 29 March 2017 |
|
|
2012 | New Power House, New Workshop & Modification of Existing Workshop Samarinda | 5025000 | PT. Mahakam Sumber Jaya | BG003 | 1 | SP001/MSJ-KRS/IV/2010 | 15/06/2012 | 15 June 2012 | 07 April 2010 | 07 April 2010 | 15 June 2012 |
|
|
2007 | Tunu Field Development Project Phase 10 for New GTS's and Tie-Ins to Existing Facilities | 454965563 | Total E&P; Indonesie | MK010 | 1 | TP10/EPSC1 | 14/02/2007 | 14 February 2007 | 03 March 2005 | 03 March 2005 | 14 February 2007 |
|
|
2007 | Tunu Field Development Project Phase 10 for New GTS's and Tie-Ins to Existing Facilities | 137138309 | Total E&P; Indonesie | SI007 | 1 | TP10/EPSC1 | 14/02/2007 | 14 February 2007 | 03 March 2005 | 03 March 2005 | 14 February 2007 |
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-2 |
|---|---|---|---|---|---|---|---|
| 1 | BG002 | B1 | AKI | ||||
| 2 | BG003 | M2 | AKI | ||||
| 3 | BG004 | B1 | AKI | ||||
| 4 | BG006 | B1 | AKI | ||||
| 5 | BG009 | M2 | AKI | ||||
| 6 | MK003 | M2 | AKI | ||||
| 7 | MK007 | B1 | AKI | ||||
| 8 | MK008 | B1 | AKI | ||||
| 9 | MK009 | B2 | AKI | ||||
| 10 | MK010 | B2 | AKI | ||||
| 11 | SI001 | B1 | AKI | ||||
| 12 | SI003 | B1 | AKI | ||||
| 13 | SI004 | B1 | AKI | ||||
| 14 | SI007 | B2 | AKI | ||||
| 15 | TI504 | B2 | GAPENRI | 2020-05-11 | 2020-05-11 | 2020-06-02 | 2020-06-02 |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|
Nama Badan Usaha |
: |
KALIRAYA SARI |
Alamat Badan Usaha |
: |
Wisma 77, Lantai 9 Jl. Letjend S. Parman Kav. 77 |
Telepon |
: |
021-5363118 |
NPWP |
: |
01.302.639.8-038.000 |
| No | Nomor Kode | Kualifikasi | Asosiasi | Pengajuan Asosiasi | Persetujuan Pusat | Persetujuan LPJK | Cetak Registrasi Th Ke-3 |
|---|---|---|---|---|---|---|---|
| 1 | BG002 | B1 | AKI | ||||
| 2 | BG003 | M2 | AKI | ||||
| 3 | BG004 | B1 | AKI | ||||
| 4 | BG006 | B1 | AKI | ||||
| 5 | BG009 | M2 | AKI | ||||
| 6 | MK003 | M2 | AKI | ||||
| 7 | MK007 | B1 | AKI | ||||
| 8 | MK008 | B1 | AKI | ||||
| 9 | MK009 | B2 | AKI | ||||
| 10 | MK010 | B2 | AKI | ||||
| 11 | SI001 | B1 | AKI | ||||
| 12 | SI003 | B1 | AKI | ||||
| 13 | SI004 | B1 | AKI | ||||
| 14 | SI007 | B2 | AKI | ||||
| 15 | TI504 | B2 | GAPENRI | 2020-06-02 | 2020-06-02 | 2020-06-02 | 2020-06-02 |
Catatan Proses (*) |
0. Permohonan Registrasi |
1. Proses Penilaian di Unit Sertifikasi |
2. Selesai Penilain di Unit Sertifikasi |
3. Proses Periode Registrasi |
4. Cetak Sertifikat |
5. Proses Pembayaran |
6. Selesai |
|